VORTEX MIXTURE – SOP for Operating Procedure

SOP for the Operation of VORTEX MIXTURE

1.0 PURPOSE

This document details the procedure for the Operation of  VORTEX MIXTURE

2.0 SCOPE

This procedure
is to be applied at the time of Operation
 of VORTEX MIXTURE

3.0 RESPONSIBILITY

Persons
along with their responsibilities are given below:

S.
No

Designation

Responsibility

 

01

Analyst

To prepare the
SOP and follow the SOP.

02

Section In Charge

To ensure
implementation of SOP.

03

Quality Assurance
Incharge

To ensure
implementation of SOP.

 

4.0 PROCEDURE

4.1 OPERATION

4.1.1 Switch on the main power supply.

4.1.2 Put on the closed container on plate.

4.1.3 Switch on instrument switch.                                           

4.1.4 Set the speed (low/ or high) as
required for that time

4.1.5 Switch off the instrument switch

4.1.6 Switch off the main power supply

4.2
CLEANING

4.2.1 Clean the instrument with Clean
Cloth.

4.3 Precaution:

4.3.1 Hold the container at such an angle that
it should not slip from hands of the user & the 
breakage should be avoided.

4.3.2 Beware of the accidents.

5.0 ABBREVIATION

QC Quality Control 

SOP Standard
Operating Procedure

6.0 REFERENCE

6.1 Based on Demonstration given by the
Services Engineer

Recorded The Data on Appendix I format No.

APPENDIX
I

LOG
BOOK FOR VORTEX MIXTURE
 

Name
of the Instrument
   : VORTEX MIXTURE

Instrument ID
No.            : 

Location                           :

 

S. No.

 

Date

Sample

Test

Report no

Analysed
By

Checked by

Remarks